Project Updates

Out of the Ground

strut through slab.jpg

main site pic.JPG

Basement 2 and Basement 1 slabs poured. Formwork in place for ground floor slab. Hydraulic struts removed. See attached pictures of hydraulic struts penetrating the Basement 1 slab. This made the pour more complex and removing the struts afterwards was very fiddly.

Due to the slope in the land, the ground floor slab has a few steps in it requiring a large amount of detail. The King Street shops will be level with King Street, the car park entry level with the entry point at Goodsell St and May Lane corner shops level to each corner. Once this pour is out of the way, the rest of the structure is straight forward.